City Departments City Government My Beloit Ask Beloit Beloit Happenings Calendar
BeloitKS.org Homepage
top_space_img
 
|
Water
Beloit Power PlantBeloit Power Plant on the corner of Chestnut and South streets.

The Electric Utility Department is divided into two divisions:

  1. the Plant Division and
  2. the Systems Division.

The Electric Utility is an enterprise fund whose intent it is to provide reliable electricity, at the lowest possible cost, to customers and to pay for the costs of providing these services through user charges.

The City's electricity can be entirely purchased from several sources or entirely generated, which gives the City outstanding reliability and diversity. The City is a founding member of Energy Management Project #2 (EMP2), and is under the umbrella of Kansas Municipal Energy Agency (KMEA) services and the electrical needs of the EMP2 members are scheduled by Rainbow Energy Marketing Corporation, which allows us to have the lowest electrical rates possible.

Overseeing the day-to-day functions of the Electric Utility is the responsibility of the Director of Plants Operations and the Director of Systems Operations.

Six full-time employees, including one foreman and five journey operators, ensure the production of power during peak demands, provide routine preventative maintenance, makes repairs to the Electric Plant, and repairs and maintains the various pieces of equipment associated with electric generators. In addition, their responsibilities include the recording and monitoring of all electric generation equipment. The Plant is capable of producing a peak capacity of 16,600 kilowatts with seven dual fuel (natural gas or diesel) engines.

The responsibilities of the Electric System Division fall on six full-time employees, including one foreman, one journey linemen, three linemen, and one meter reader. The linemen are well trained with a four year Apprenticeship program. They provide the daily maintenance and repair necessary to properly operate the system of over 63 miles of primary electrical lines, 500 street lights, 2,000 electric meters and 2 electrical substations. This crew is also responsible for installing new power lines (above ground and underground), and providing preventive maintenance to all electric lines within the system. The City is part of a "Mutual Aid Program" which allows the City to bring in a lot of trained help, from all over the State, if needed for storm or other emergency replacement and repairs.

In 2001, the Utility completed the construction of a new 115 kV substation and 34.5 kV transmission line to Beloit.

Click here for the current Integrated Resource Plan (IRP).

ELECTRIC DEPARTMENT
215 S. Chestnut
Beloit, Kansas 67420

Phone: 785-738-5121

ELECTRIC PLANT

Lloyd Littrell
Director of Plant Operations

Henry Eilert
Foreman

Charles Axtell
Operator II

Stan Whitlow
Operator II

Steve Nelson
Operator II

Manfred Milbers
Operator II

John Highland
Operator I

ELECTRIC SYSTEMS

Jerry Blass
Director of Systems Operations

Ron Sporleder
Foreman

Steve Krier
Journey Lineman

Allen Mong
Lineman

Terry Amerine
Lineman

Shawn Feik
Lineman

Jessica Rosebaugh
Meter Reader

 
 

SEARCH:

CITY OFFICES

Beloit Municipal Building
119 N. Hersey Avenue
Beloit, Kansas 67420
785-738-3551
info@beloitks.org

BeloitID
 
Home | City Departments | City Government | My Beloit | Ask Beloit | Beloit Happenings | Calendar | Contact Us
CITY OFFICES
Beloit Municipal Building • 119 N. Hersey Avenue • Beloit, Kansas 67420 • 785-738-3551 • info@beloitks.org
©2009 City of Beloit
Site Design: Mill Street Trading Company, LLC | Powered By: JNT Company, LLC